Menu
📣🇨🇳China warehouse significantly reduces prices, Better prices, same trusted quality & global delivery.
Factory source for research supply

Wholesale research peptides from a direct supply system.

WBS Shop is built for repeat buyers, local distributors, and research supply teams that need stable kit packaging, clear batch documentation, and warehouse-based fulfillment without retail noise.

10-vial standard kit planning
24h business-day tracking flow
RUO research use only supply
LINE 01

Direct production sourcing

Factory-side pricing, repeated batch planning, and fewer reseller layers between source and buyer.

LINE 02

Global warehouse routing

Active hubs in China, the USA, and Canada support current routing, with a Brisbane, Australia location in planning.

LINE 03

Batch traceability

COA records and lot-aware product documentation keep quality checks visible before restocking.

LINE 04

Distributor support

Live support helps coordinate products, payment, warehouse selection, dispatch, and order follow-up.

Quality system

A visible route from production to buyer confidence.

Production

Factory batch preparation

Products are organized around repeatable batch and kit handling instead of one-off retail presentation.

QC

Purity review

Quality control documentation supports buyer review before a product becomes repeat supply.

Pack

Kit and label control

Packaging is planned for inventory clarity, warehouse sorting, and reseller stock management.

Ship

Warehouse dispatch

Orders move through the most practical hub based on product location and buyer delivery needs.

WBS buyer community

Join the WBS community. Hear from other buyers.

Read member reviews and ordering experiences, ask product and ordering questions, and share your own feedback. Join your preferred channel to stay up to date with warehouse stock, dispatch notices, and the latest WBS announcements.

Member reviews and ordering experiences Product questions and buyer discussions Stock, dispatch and WBS updates
Official WBS group WhatsApp Join
Official WBS group Telegram Join
Official WBS group Discord Join
For your privacy, do not post order numbers, payment details, or delivery addresses in community groups.
Global fulfillment infrastructure

A multi-warehouse network built for dependable regional supply.

Our fulfillment system combines one global dispatch hub in Guangzhou with dedicated domestic warehouses in the United States and Canada. A future Brisbane location is being planned to extend this network into Australia.

5active warehouse locations
3countries with local inventory
Globaldispatch from Guangzhou
Brisbaneplanned Australia warehouse
WBS warehouse network in Guangzhou, Portland, Delaware, Edmonton, and planned Brisbane, Australia China · USA · Canada · Planned Australia Hub
Independent testing documentation

Recent reports, independently tested and verifiable.

WBS uses Janoshik Analytics for independent chemical analysis. Homepage previews show only the report header; product, client, batch, result, and verification-key fields remain hidden here.

Latest records

Recently added certificates

View certificate library

These compact homepage cards are privacy-safe header previews. Open a record to review its complete available document and verification information.

Review all records
Verified order experiences

What completed orders say about WBS.

Feedback about shipping and logistics, products received, and communication with support.

5.0 6 verified order reviews
Anonymous buyer United States
5.0
Anonymous Review

Becky amazing service

Becky has always treated me right. I would recommend 100%.

Ordered Jul 23, 2026
China Warehouse
Verified completed order
T*** United States
5.0
Order Review

Becky is amazing

Becky is amazing and fast. She will take care of you. Have order 4 or 5 times. Would recommend.

Ordered Sep 16, 2026
US Warehouse
Verified completed order
Anonymous buyer Poland
5.0
Anonymous Review

Another excellent order

I need to repeat myself but order with WBS and Becky are always the best. Did multiple orders and always had current status and information about everything. Big recommendation!

Ordered Sep 8, 2026
China Warehouse
Verified completed order
WBS Support

Thank you dear, thank you for your visit again, we will continue to provide you with a better shopping experience❤

Customization services

Need custom labels or cap options for your kits?

WBS supports custom labels, standard cap selection, and custom caps so buyers can prepare clearer kit presentation for trial orders, repeat batches, and branded supply planning.

Labels from 10 kits Standard caps $0/kit Custom caps from 100 kits

Service menu

Custom labels MOQ 10 kits · $3/kit · 7 days
Select standard caps MOQ 200 kits · $0/kit · 7 days
Custom caps MOQ 100 kits · $5/kit · 10 days

Label artwork limits

Max label size 20mm high × 50mm wide. Minimum font height ≥1mm, QR code ≥5mm for reliable readability.

Factory supply questions

Short answers for distributors and repeat buyers before ordering.

Product authenticity, quality documentation, and storage guidance.

Are your peptides real and authentic?
Yes — we are a factory-direct supplier with stable production and large inventory.
All products are manufactured under strict quality standards, and COAs (Certificates of Analysis) are available for verification.
How should peptides be stored?
Lyophilized (powder) peptides can be stored at room temperature before mixing.
After reconstitution, they should be refrigerated (2–8°C) and used within 4–6 weeks.
Unmixed (lyophilized) peptides can remain stable for up to 24 months when stored properly.
WBS
Factory support desk Product, shipping, payment, and bulk order help

Contact our online support for real-time communication about products, orders, shipping, payment, or bulk supply.

Online customer service Replies during business hours